Basement drywall progression
One basement room shown in sequence as ceiling drywall is installed, the boarded surfaces are finished, and the room is completed.

Stage 1 of 3 Ceiling drywall being installed while the wall framing and insulation remain exposed.

Stage 2 of 3 The same room fully boarded, with taped joints and compound visible across the walls and ceiling.

Stage 3 of 3 The same room with painted walls and ceiling, recessed lighting, baseboards, and finished flooring.

