Garage finished in Herndon
A garage in Herndon finished into a usable room, shown before the work and after.

The garage before the work, with the framing and insulation still exposed.

The same garage after the drywall was installed, finished, and painted, with LVP flooring laid.

Another view of the finished room.

The new window and door installed in the finished wall.